Enverse

Create a Project

Set up a project in SkyBridge, give your team access, and understand how a project is organised.

Overview

A project is a site in SkyBridge — a factory, a building, a plant, a group of assets at one location. Everything else you work with belongs to a project: its devices, its data, its dashboards, its documents and its people.

This page covers, all from the SkyBridge web app:

  • How a project is organised, and what you can do inside one.
  • Creating a project and filling in its details.
  • Giving colleagues access to it.
  • Editing its details, and deleting it.

You do not need any technical setup to follow this. If you can sign in to SkyBridge, you can work through everything here.

How a project is structured

The shape of it

Your company owns projects. Each project is one site. Inside a project sit the things that make it useful:

Inside a projectWhat it is
DevicesThe meters, PLCs, inverters and controllers being monitored.
DataEvery reading those devices report, stored against the project.
DashboardsThe views your team looks at day to day.
InsightsAnalyses that run over the project's data.
MessagesAlerts and notifications raised by the site.
Maintenance and documentsActivity records and files kept with the site.
Authorized usersThe people allowed to open the project.

Nothing is shared between projects. Two sites means two projects, each with its own data, dashboards and user list.

Two workspaces

Once you open a project, SkyBridge splits its screens into two workspaces, which you switch between from the sidebar.

Project Workspace — the day-to-day view of the site:

  • Dashboards — the site's live views.
  • Asset Management — the devices and equipment on site.
  • Data Exploration — query and chart the recorded data.
  • Messages — alerts and notifications.
  • Maintenance — activity and service records.
  • Documents — files stored with the project.

System Workspace — how the site is set up:

  • Project Management — project details, authorized users, deletion.
  • Device Studio — register and configure devices.
  • Insights — set up the analyses that run on the project.
  • Configure Message — define what raises a message.
  • MQTT — connection details for devices reporting into the project.
  • Account Management — the users in your company.

The short version: Project Workspace is where you use the site, System Workspace is where you set it up.

How a project is organised
Your company
Kuala Lumpur Plant
Johor Warehouse
Penang Site

Project Workspace

Use the site

  • Dashboards
  • Asset Management
  • Data Exploration
  • Messages
  • Maintenance & Documents

System Workspace

Set the site up

  • Project Management
  • Device Studio
  • Insights
  • Configure Message
  • MQTT

How data reaches a project

A device on site reports into SkyBridge, SkyBridge files each reading against the project that device belongs to, and dashboards, insights and messages all read from that same store. That is why the project has to exist first — it is the place the data lands.

Creating a project also prepares its data storage in the background. There is nothing for you to configure; it is ready by the time the project appears in your list.

Before you start

  • You are signed in to SkyBridge. The project is created under your company, so sign in with your normal work account.
  • You know the site's country and time zone. The time zone is how the site's own clock is interpreted — pick the zone the site is in, not the one you happen to be sitting in. Getting it wrong shifts every timestamp and chart on the project.

Create a project

Open the Projects screen

After signing in you land on Project Overview, headed "Select a project / action to manage the site". It lists every project you can open.

If you have none yet, you will see No projects yet — Create a project to get started.

Project Overview

Project Overview

Select a project / action to manage the site

Add Project

Kuala Lumpur Plant

Main production site

Dashboard2AssetsExplore Data5MessagesMaintenanceDocumentsConfigure

Johor Warehouse

Cold storage and logistics

Dashboard2AssetsExplore Data5MessagesMaintenanceDocumentsConfigure

Choose Add Project

Select + Add Project above the project list. The Create a new project dialog opens — "Enter the basic information for the new project."

Fill in the four fields

All four are required.

Create a new project

Create a new project

Enter the basic information for the new project.

Project nameProject name
DescriptionProject description
Time zoneSelect a time zone
CountrySelect a country
Create project
FieldWhat to enter
Project nameWhat the site is called. This is what appears on the project card and in the project switcher, so use the name your team already uses for the site.
DescriptionOne line on what the site is. It shows under the name on the project card.
Time zoneThe site's local time zone. The picker is searchable — type a city or an offset.
CountryThe site's country. Also searchable — start typing the name.

Leaving any of them empty stops the form with a message under the field: "Project name is required", "Description is required", "Timezone is required" or "Country is required".

Select Create project

The button shows a spinner while the project is set up. On success the dialog closes, Project created appears, and the new project shows up in the list straight away.

If something goes wrong you will see Could not create the project, and the dialog stays open with your entries intact so you can try again.

What you get

The new project appears as a card showing its name and description, with a row of links straight into the site:

LinkTakes you to
DashboardThe project's dashboards.
AssetsAsset management for the site.
Explore DataData exploration.
MessagesThe project's messages.
MaintenanceMaintenance records.
DocumentsStored documents.
ConfigureThe System Workspace — project settings.

The Assets and Messages links carry small coloured counters when there is something to look at: red for alerts, amber for warnings, and outlined for everything else. A new project starts with none of them.

Project card

Kuala Lumpur Plant

Main production site

Dashboard2AssetsExplore Data5MessagesMaintenanceDocumentsConfigure

The counters on Assets and Messages appear only when there is something to look at — red for alerts, amber for warnings.

A new project is empty by design

There are no devices, no data and no dashboards yet. Registering devices in Device Studio is what starts filling it — see Onboard Devices.

Give your team access

Creating a project does not give anyone else access to it. Each person has to be authorized on the project individually.

Open Project Management

From the project card choose Configure, then Project Management in the System Workspace sidebar — "Manage access rights and project information".

Find the Authorized users card

It lists everyone who can open this project, with their Name and Company. Both columns sort, and the list pages once it gets long.

An untouched project reads No users are authorized for this project yet.

System Workspace › Project Management

Project Management

Manage access rights and project information

General project info

Project nameDescriptionTime zoneCountry

Delete project

Removes the project and everything in it.

Delete

Authorized users

These users can access this project. Only visible to admin users.

Add user
NameCompany
Aisyah RahmanAcme Manufacturing
Daniel LimAcme Manufacturing
Priya NairNorthwind Services

Admins only

The Authorized users card is only visible to admin users. If you cannot see it, ask an administrator at your company to grant the access for you.

Select Add user

The Authorize new user dialog opens — "Give a user access to this project." Pick the person from the list and confirm.

The list offers everyone in your own company plus everyone in your contractor companies, so you can bring a contractor onto a single site without giving them anything else.

Confirm

User authorized appears and the person shows up in the table immediately. They can open the project the next time they sign in.

If they already have access you will be told so, and nothing is duplicated.

Removing access

Use the bin icon on the person's row. SkyBridge asks you to confirm — the named user "will no longer be able to access this project" — and on Remove access the entry disappears and Access removed is shown. Their account is untouched; they simply lose this project.

Edit project details

The same Project Management screen carries a General project info card with the project's name, description, time zone and country. Edit them there and select Update; Project updated confirms the change.

Changing the time zone changes how existing data is presented, so treat it as a correction rather than a routine setting.

Delete a project

Project Management also carries a Delete project card. Read it before you use it:

Deleting a project cannot be undone

Deleting removes the project and all of its gateways, devices, data points, reports, messages and documents. There is no recovery. SkyBridge asks you to confirm, naming the project, before anything happens.

If you only want to stop someone using a site, remove their access instead — that is reversible; deletion is not.

If something does not look right

What you seeWhat it means
Could not load projectsThe app could not reach SkyBridge. Check you are still signed in and try again; if it persists, contact your administrator.
No projects yetYour account has no projects. Either create one, or ask a colleague to authorize you on an existing project.
A project you expected is missingYou have not been authorized on it. Ask an admin at your company to add you under Authorized users.
A message under a fieldThat field is required — fill it in and submit again.

Next steps

On this page